Tri-County Regional Vocational Technical High School

147 Pond Street, Franklin, MA 02038

Visit Website

The project

Tri-County Regional Vocational Technical High School was looking for a DCKV system as part of ongoing energy upgrades with the campus. The school consists of a Main Kitchen for standard operational cooking and a Culinary Kitchen for teaching and labs. System capabilities of integration with an existing building automation system, cloud-based services, automatic on and off sensing, and integration with existing heat exchange units were a must for this location.

 

Solution

National Resource Management (NRM) furnished and installed two ECOAZUR systems at this high school resulting in tremendous energy savings and ease of use for their existing systems. With ECOAZUR’s ability to automatically turn on and off with varying cooking detection, the school no longer had to rely on any schedules for their operations and can now enjoy a worry-free energy savings solution that surpasses initial estimations.

The Results

Runtime Hours per Day: 8 | Total Controlled CFM: 22,275

Estimated Preliminary Analysis:

Average New Fan Speed: 65%

Electrical Savings: 24,886 kWh / year

Electrical Savings: $3,733.00 / year

Heating Savings: $4,815 / year

Cooling Savings: $103 / year

Post Installation Analysis:

Average New Fan Speed: 52%

Electrical Savings: 32,450 kWh / year

Electrical Savings: $4,867.00 / year

Heating Savings: $6,672 / year

Cooling Savings: $143 / year

Graphs

We're ready to help! Learn more.

11 + 1 =

Affiliates

Kitchen Energy Solutions

40 King Street | Unit 1 Auburn, NH 03032
T (603) 262-9292 Option 3
info@kitchenenergysolutions.com

Kitchen Energy Solutions is a brand of Air Solutions & Balancing, LLC

Affiliates

Kitchen Energy Solutions

40 King Street | Unit 1 Auburn, NH 03032
T (603) 262-9292 Option 3 Info@KitchenEnergySolutions.com

Kitchen Energy Solutions is a brand of Air Solutions & Balancing, LLC
reCAPTCHA demo: Simple page