Lahey Hospital & Medical Center
41 Burlington Mall Road, Burlington, MA 01805
The project
Medical centers and hospitals are a great opportunity for energy savings in their commercial kitchens due to the long run time hours and quantity of cooking activity taking place. Lahey Hospital was no exception with 4 large kitchen hoods and 4 exhaust fans to move a large quantity of air all day long.
Solution
The ECOAZUR standard system utilizing temperature and optic sensors was a perfect retrofit solution for this facility to ensure the exhaust fans and associated makeup air units would be able to modulate based on the varying cooking activity and operate on an as needed basis. With BACnet communication to the building automation system, bypass variable frequency drives, and a full turnkey installation, ECOAZUR will be continuously saving energy.
The Results
Runtime Hours per Day: 24 | Total Controlled CFM: 23,650 | Total Controlled HP: 39
Estimated Preliminary Analysis:
Average New Fan Speed: 59%
Electrical Savings: 170,774 kWh / year
Electrical Savings: $25,616 / year
Heating Savings: $20,064 / year
Cooling Savings: $710 / year
Post Installation Analysis:
Average New Fan Speed: 55%
Electrical Savings: 176,136 kWh / year
Electrical Savings: $26,420 / year
Heating Savings: $22,022 / year
Cooling Savings: $780 / year
Graph

We're ready to help! Learn more.
Affiliates




Kitchen Energy Solutions
40 King Street | Unit 1 Auburn, NH 03032
T (603) 262-9292 Option 3
info@kitchenenergysolutions.com
Kitchen Energy Solutions is a brand of Air Solutions & Balancing, LLC
Affiliates




Kitchen Energy Solutions
40 King Street | Unit 1 Auburn, NH 03032
T (603) 262-9292 Option 3 Info@KitchenEnergySolutions.com